Q
What kind of profile material does HENNISSY use, and what are its advantages?
We adopt Aerospace-Grade Aluminum Alloy 6063-T5/6063-T6 with a wall thickness of 1.4-3.0 mm (customizable). It features high strength, excellent corrosion resistance, strong wind pressure resistance, and a long service life, fully adapting to various complex outdoor environments.
Q
What glass configurations are available for your doors and windows?
We provide flexible glass options including single glass, double insulated glass; Low-E, laminated, and triple insulated glass are optional, with the insulated glass gap ranging from 12A to 27A. All glass configurations deliver outstanding thermal insulation, sound reduction, UV protection, and safety explosion-proof performance according to project needs.
Q
How about the sealing and thermal insulation performance of HENNISSY products?
Our products are designed with multi-seal technology using German/Japanese grade gaskets, with an optional dual thermal break structure. This design ensures superior air tightness, water and wind resistance, and optimizes heat and sound insulation to maintain a comfortable indoor climate.
Q
What hardware accessories are equipped, and is smart customization supported?
We use high-quality stainless steel or imported hardware accessories that operate smoothly, resist wear, and have low maintenance requirements. Products are compatible with both smart locks and standard locks, and can be adapted to various hardware grades according to customer specifications.
Q
Can HENNISSY doors and windows be customized, and what are the customizable ranges?
Yes, we provide a full one-stop customization service. Customizable options cover dimensions, profiles, colors, and multiple opening modes (inward casement, outward casement, sliding, folding, and awning) to ensure comprehensive scenario adaptation for both residential and commercial projects.
Q
What is the delivery cycle for samples and bulk orders?
The delivery timeline for samples is 5-7 working days, while bulk orders typically require 35-45 working days. For urgent construction schedules, lead times can be negotiated based on current manufacturing capacity to reliably meet project deadlines.